Poor document preparation causes major delays. This article details required documents, common pitfalls, and certificate obligations.
·eCall Type Approval: Focus on function, IMS, MSD.
·CE RED: Focus on RF, EMC, safety.
II. Core Type Approval Documents
1. Product Technical Specification
Matches sample model/version; details functions, communication, positioning, hardware/software.
2. System Architecture Description
Actual IMS/SIP/MSD flows (not standard screenshots).
3. IMS Signaling Conformance Document
Protocol stack details, SIP/SDP config, re-registration logic. Module reports do not replace full-device testing.
4. Positioning Performance Materials
Multi-constellation scheme, accuracy claims (50m CEP 95%).
5. Schematics & PCB Layout
RF, backup battery, ESD design.
6. Software Version Statement
IMS, eCall app, GNSS, module firmware versions bound to certification.
7. Risk Analysis & Test Plan
Failure modes (IMS fail, GNSS loss) and mitigation.
8. Test Reports
EN 17184, EN 17240, ETSI TS 103 128, EMC, environmental.
III. CE RED Extra Documents
RF specs, EMC reports, RED risk assessment, user manual, EU REP.
IV. Certificate Validity & Obligations
·No fixed expiry; valid if product unchanged.
·Invalidated by major design changes or regulation updates.
·10-year document retention post-production.
·Change management required for software/hardware updates.
V. CE RED Ongoing Duties
EC-REP fees, DoC maintenance, 10-year archiving.
BLUEASIA assists with document preparation and full certification. Contact: +86 13534225140.
Related News